1

Install two M10 threaded drop rods

The top fixing will depend on ceiling construction type.

2

Ensure that the locking nut is fully un-screwed.

This will enable the Rod Lock device to slide easily up the rod.

3

With the “open side” of the channel facing upwards

Ensure the channel is kept level and slide the TRAPEASY® up the drop rods to the correct level.

4

Rotate the locking nut until fully screwed into the Rod Lock device.

The TRAPEASY® channel will no longer slide up the threaded rod.

5

Use the larger Rod Lock body to rotate in either direction for fine adjustment to the height level.